Cutting big holes in newly finished drywall is nerve-wracking, but it is now completed without any significant mishaps.

Here's my "OMG WHAT HAVE I DONE" pic:

...and then, "Oh, that turned out well"

Pic of the ceiling speakers in the kitchen:


Friday, June 27, 2014

Picture time!


Time for some pictures!  
Here is a snapshot of all of the choices we made.  Nora was a big helper...she has an eye for design. ;)
 

 Here is our kitchen flooring all installed! 

Kids bathroom/basement bathroom flooring complete

 Master bathroom flooring

Some doors are up

And even some trim!  (I think all of this still needs to be painted...they must paint while it is up?)


This is what we came up with for the paver patio.  The lighter color will be the main part and the dark gray will be the perimeter.  

Aaaaand...here is the siding!  
  

And a driveway...with some soccer cleat imprints courtesy of Nora...


It is coming along nicely! Next week the cabinets will be in. And we have a "ready for move in" date of August 7th.  Anyone want to get a good lifting workout in?! ;)

Monday, June 23, 2014

Can you decide on that...by tomorrow...

There seems to be a trend of asking for decisions rather quickly.  Which is funny because a couple times when I've felt all caught up on decisions I have asked..."What should we be working on next?" And they say "Nothing for a while now".  But then a week later they call and say "Did you decide on stone for the outside?" or "Did you get your light fixtures yet?"  Cuz were gonna need that...tomorrow.  :)  But honestly that is OK because I think we make our best decisions under pressure.
Here is what we/they have been working on the past two weeks:
Drywall/Painting
The drywall taping/mudding is complete and all walls are primed and painted!  We choose Benjamin Moore Pashmina for the walls. I was concerned about it being too dark, but I was WRONG.  I absolutely love it on the walls.
Electrical
After the painting was finished the electricians came in.  One guy was great...one guy was clearly learning the trade.  I think Jesse was about to step in and help him figure out how to wire that three-way switch. ;)  We got a call last Thursday morning from the electrician asking if we picked out any of our lighting.  So we took the day off of work and off to Menards and Lowes we went. We got everything except our island lighting, entry lighting and great room fan purchased.
Countertops
We also worked on picking out countertops.  We had to go through the remnants and pick ones that fit with our color schemes.  The first day we went was Wednesday. Which happened to be rainy and muggy and we were being attacked by mosquitoes.  I wanted to make decisions just so we could get out of there!  We went back on Thursday so we could make better choices and I'm glad we did because Jesse found an awesome remnant for our master bath hiding behind 3 other ones.
Landscaping
We signed our landscaping contract last week.  We are hoping to have our lawn seeded by the time we move in.  We will be putting in sprinklers on a well, hydroseeding, planting a few trees and putting stone around the outside perimeter.  We are having them do a pavers patio with a built in firepit, too.  I think we will really love our outside space!
Appliances
We also bought all of our appliances on Friday of last week.  We ended up going with stainless steel even though I'm concerned about fingerprints.  I'm really excited about having a dishwasher with a door that doesn't fall down all the time.  And a refrigerator with an ice maker! 
Flooring
Today they start on the hard floors in the house so the cabinets will be ready to be installed soon.  They are also working on soffits and siding this week.  Oh...and our garage doors were put up last week. 
Geeky Stuff
Jesse has been working on his geeky stuff.  Computer wires and speaker wires.  I won't go into the details of all of that. But he is doing a great job and I know we will love the speakers. :)
Whew!  So a lot has happened in the past two weeks.  It has been a whirlwind.  But I think Jesse and I are both loving the process.
I will be sure to post some pictures soon. 

Tuesday, June 10, 2014

Two months to go

The drywall is all up and taped and mudded. They are supposed to texture tomorrow and maybe start painting on Friday!  The drywall company sure works their employees hard.  I went by the house to pick up a sample of the trim and siding at 7:00 PM on a Friday and there was one lonely guy working.  Jesse stopped by the house on Sunday around 2:00 PM.  Same guy...still working...on stilts so he could drywall the ceiling.  Not really sure how I feel about that.  My house isn't THAT important. :(
In other news, we had to show our rental home today.  The landlord is trying to sell it.  I'm secretly hoping it doesn't work out because I'm pretty sure we will need to extend our lease by a couple weeks. 
Last week we picked out all of our flooring with the help of this awesome designer, Gail, at Designers 2. 
The wood is going in the kitchen/dining area as well as our basement bedroom/workout room.  The lighter tile is going in two of the bathrooms.  The darker tile is going in the master bath.  The carpet we chose is the second from the left.  The two little blocks are our cabinet colors.  White for kitchen.  Dark for island, bathroom, railing, mantle and desk.
 
We also have to pick outside stone by the end of the week.  This is what we are thinking:
 
 
We also decided on a paint color and "upgraded" our look to have white ceilings.  Of course with the upgraded looked comes an upgraded price tag. ;)
 
Here is the paint color we choose.  Benjamin Moore Pashmina:


This week we need to focus on what we are doing with the patio in the backyard and picking out stone for the fireplace.

Monday, June 2, 2014

Slow the ef down.

Between house building, kids activities, birthdays, end of school and work our life has been absolutely nuts lately!  Every night of the week we are booked with something. I'm ready for life to slow down once summer starts. 
Jesse did all of the wiring last weekend.  The plumbers, HVAC and electricians have all finished their in-wall jobs.  Which means we are ready for dry wall!  Last Friday I stopped by the house and they had loaded all of the dry wall in the house so they are ready to go this week.  They are scheduled to be finished with drywall in 2 weeks.  Now that we are at this stage it seems the builders are looking to us for many decisions.  This week we will need to decide on garage doors, interior doors, interior trim, flooring and paint colors.  Whew!
You would think picking a garage door would be easy.  Here is what you need to pick on the garage door along.  First of all there are 7 different "collections" from Clopay.  Each of those collections has varying levels of construction which affects the energy efficiency.  Then there is short panel or long panel.  About 20 different window options.  Type of hardware on the door.  
Here is what we ended up with (looks nothing like our house, but the garage door is what we picked)

Then onto the interior doors.  Same kind of thing.  7 different "series".  In those series 14 different "panels".  2, 3, 4, 5, 6 panels?  Arched or square?
Here is our door...we went with the 2 panel square:

We decided to meet with an interior designer regarding flooring choices and that will be on Thursday.  Our decision will need to be by Friday to make sure they are ready for install on June 23rd (the hard floors need to go under the cabinets).    She will also help us pick out paint colors which also need to be decided by Friday.  More pictures to come with flooring choice and some dry walled rooms!